Kongu Industrial Corridor

Executed industrial infrastructure in Tamil Nadu

Over 2.4 million square feet of engineered manufacturing space and 35 megawatts peak of utility solar commissioned across Erode and Perundurai.

Performance Record

Accountability in hard numbers

2.4M sq.ft

Built industrial footprint

35 MWp

Solar capacity commissioned

98.4%

On-schedule handover rate

100%

Statutory safety compliance

Client Proof

Promoter and engineer verifications

Sellandiamman Group managed our 180,000 square foot weaving shed from foundation excavation to statutory grid synchronization without a single day of idle labor.

K. Sengottaiyan, Managing Director, Kongu Textile Mills, Perundurai

Having our civil structures, RMC supply, and rooftop 1.2 MW solar engineered under one single corporate contract eliminated every contractor coordination dispute.

R. Prakash, Director of Infrastructure, Southern Agro Processing, Erode

Their concrete quality documentation and structural engineering standards matched institutional audits from our central banking consortium seamlessly.

M. Dhanasekaran, Chief Project Engineer, Western Logistics Hub, Tirupur Corridor

Schedule a site visit

Inspect active factory construction or commissioned solar plants across the Erode and Perundurai corridor with our senior civil engineering leads.